Summary
The Lena Sue Beam Boiler Addition Project solicits a contractor to remove the existing steam-powered heating system and install a new hot-water heating system including two condensing boilers, new pumps, air handlers, and air purifiers. The work includes demolition of existing condensate recovery unit, heat exchanger, and air separator and requires installation per the plans and specifications with compliance to the North Carolina Building Code, NFPA, and ASME standards and obtaining necessary permits and inspections. A pre-bid/site meeting is scheduled for 2026-07-29 and proposals are due by 2026-08-12; procurement documents (bid set and project manual) are available from the buyer’s NC eProcurement solicitation page.