Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
A qualified supplier to design, fabricate, inspect, test, deliver, dress, and fill two (2) three phase power transformers to be installed at Glen Carter Substation 138-12.47kV (Transformers to be 13.2kV Nominal low voltage) Substation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking sealed bids for furnishing four single-phase power transformers.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Seeking sealed bids for furnishing four single-phase power transformers.
Available2 Ea 30/40/50//56.2 MVA transformer, 115-12.47 kV, three phase, 60 Hz, Class ONAN/ONAF/ONAF, 55º/65ºC rise, with open air LV secondary (standard configuration);
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
2 Ea 30/40/50//56.2 MVA transformer, 115-12.47 kV, three phase, 60 Hz, Class ONAN/ONAF/ONAF, 55º/65ºC rise, with open air LV secondary (standard configuration);
AvailableThis RFP is for a vendor to design, procure, and install playgrounds with Engineered Wood Fiber (EWF) surfacing at two City parks.
Posted Date
-
Due Date
Jan 3, 2026
Release: -
Close: Jan 3, 2026
This RFP is for a vendor to design, procure, and install playgrounds with Engineered Wood Fiber (EWF) surfacing at two City parks.
AvailableRelease: Nov 27, 2025
Close: Jan 8, 2026
Electric Utility Distribution Transformers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis