Summary
Golf course green construction, bunker construction, irrigation and grassing construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Mobilization, permits, install proposed swppp. Clear undergrowth trees, cut stumps to grade. Spray herbicides (by owner, unless alternate 8 accepted). Scalp, verti-cut and aerify existing turf (by owner, unless alternate 9 accepted). Strip turf and topsoil in areas to be graded, stockpile. Core existing sand/mix from sand bunkers, tees and greens. Demo and dispose of cart paths, replace with new cart paths (where shown). Mass grading and shaping of indicated areas (partial). Replace and install new drain pipes. Expand 10 greens to original dimensions. Build 10 new green complexes, complete. Build, level and install new mix on all main tee complexes, build 16 new forward tees, 1 new back tee on hole 18 (and others, if alternate bids are accepted). Install complete new irrigation and upgrade pump station. Remove sand, rebuild and/or remove sand bunkers as shown on plans, install new sand. Prep soil, fertilize, amend, and grass (sod or seed as shown on plans).