Eastern Oklahoma State College
Higher EducationOK
Posted
-
Dec 3, 2026
RFP 27-02 Apartments 34, 35 and 36 Remodel
Renovation and remodeling of Apartments 34, 35, and 36 on the Eastern Oklahoma State College campus.
Description: Work inlcudes clearing and grubbing, removal of old bridge, construction of a prestressed concrete bridge with 1 31', 1 60', and 1 31' prestressed concrete beam spans at 28.0' clear roadway, grading and drainage, box culvert extensions, barb wire fence installation, erosion control, limestone base and hot mix asphalt base and surface.
County · MS, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
87 days before RFP
Lafayette County proposed engineering services to prepare plans, specifications and contract documents for replacing Bridge 161 on CR 376.
8. Approve and execute engineering agreement for Lafayette County Bridge Replacement project LCBR 36(02) for bridge number 161 on CR 376. (Larry Britt) AGREEMENT FOR ENGINEERING SERVICES FOR PROJECT NO. LCBR-36(O2) IN LAFAYETTE COUNTY, MISSISSIPPI THIS AGREEMENT, entered into this the _day of 2026, by and betWeen the BOARD OF SUPERVIOSRS OF LAFAYETTE…
Lafayette County Board of Supervisors Regular Meeting
Agenda packet · Aug 3, 2026
Agenda packet
38 days before RFP
The proposed Bridge and Culvert budget for fiscal year 2026–27 includes $700,000 for asphalt and $300,000 for culverts.
\*\*\*\*\*\*\*\*\*\* TOTAL BUDGETED EXPENDITURES 6,072591.00 998 ENDING CASH RESERVE 882.68600 \*\*\*\*\* TOTAL EXPENDITURES, ENDING CASH . OTHER FINANCING USES 6,955,277.00 LAFAYETTE COUNTY 2025/2026 160 BRIDGE AND CULVERT PROPOSED BUDGET FOR FISCAL YEAR 26-27 TAXESAND AD VALOREM 200 REALTY/PERSONAL 2,890,350.00 201 MOTOR VEHICLE 350,384.00 202 MOBILE HOME…
Meeting agenda
3 days before RFP
Lafayette County proposed advertising bids for the LCBR-36(2) bridge project on CR 376.
LAFAYETTE COUNTY BOARD OF SUPERVISORS October 26th, 2026 9:00 AM 1. Call to Order 2. Approve Agenda 3. Approve minutes of regular meeting October 5th, 2026. 4. Accept jail meal log and affidavit from Jail Administrator per section 19-25-74. 5. Approve claims docket for claim numbers . ++ New Business++ 6. Consent Agenda: a) Authorize adjustment of Solid…
RFP published
Proposals due (8 days left)
Lafayette County Board of Supervisors Meeting Minutes
Agenda packet · Sep 21, 2026
Lafayette County Board Of Supervisors Meeting Agenda
Meeting agenda · Oct 26, 2026
Decision makers connected to this RFP from Lafayette County.
Adjacent opportunities open for bidding right now.
Eastern Oklahoma State College
Higher EducationOK
Posted
-
Dec 3, 2026
Renovation and remodeling of Apartments 34, 35, and 36 on the Eastern Oklahoma State College campus.
CountyFL
Posted
Sep 24, 2025
Dec 14, 2026
Construction of wastewater collection system improvements, including a submersible duplex lift station, force mains, gravity sewer, sanitary manholes, and associated appurtenances. Work also includes maintenance of traffic, erosion and sedimentation control, clearing and grubbing, utility installation, testing, and restoration of disturbed areas. The Base Bid consists of constructing the above-described facilities, whereas the Bid Alternate consists of all Base Bid work and only the portion of force main from the lift station wet well to the designated termination point, as identified in the Contract Drawings.
CountyFL
Posted
Nov 12, 2026
Dec 15, 2026
CR 769 FORCEMAIN REPLACEMENT PROJECT: The DeSoto County Utility Department (DCU) wishes to receive formal bids from Contractors for the CR 769 Force Main Replacement Project. SCOPE: Work includes cutting, capping, and abandoning the existing 8” HDPE force main. This force main will be replaced with 2,940 linear feet of 16” HDPE force main from Preserve Parkway to Agnes Street along the CR 769 right of way along with associated, fittings, valves, and appurtenances and sod restoration. BASIS OF AWARD: The basis of award is the lowest responsible/responsive bidder for all work included in the Base Bid. GOVERNING SPECIFICATIONS: All work shall be in conformance with the following: • Construction Plan Set • Project Specific Technical Specifications • DCU Utilities Standards Handbook (https://www.desotobocc.com/253/Utility-Ordinances) • FDOT FY 25-26 Standard Plans for Road and Bridge Construction and applicable Interim Revisions (IRs) • FDOT FY 25-26 Standard Specification for Road and Bridge Construction COUNTY NOTIFICATION: The Contractor is required to notify the County at least 2 County business days prior to all workdays. All work to be performed between 8:00am and 5:00pm, Monday through Friday and on non-County holidays. TIME FRAME: All work shall be complete within eighty (80) calendar days of the notice to proceed. The total contract will be for ninety (90) calendar days which will allow time for County inspection and correction of deficiencies if noted. BONDS: Payment and Performance Bonds are required for this work.
Florida Department of Transportation
State AgencyFL
Posted
-
Dec 2, 2026
Roadway safety improvements, including high-friction surface treatment, signing, and pavement marking updates on CR 118 (Airport Road) at Buckhorn Drive in Okaloosa County.