Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed project will include the demolition and environmental decommissioning of the high-bay hangar for united airlines; the installation of new electrical and utility infrastructure; the installation of new pavement, pavement replacement & repairs and site improvements; lighting and security enhancements as directed by LAWA. Bid Packages (includes but is not limited to):SWPP / Erosion Control, Surveying, Final Cleaning, Abatement, Building & Site Demolition, Concrete Reinforcing, Building Concrete, Fire Suppression System, Plumbing, HVAC, Electrical, Earthwork, Asphalt Paving, Site Concrete, Fencing & Gates, Site Utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide premium airport concierge meet and greet services
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Provide premium airport concierge meet and greet services
AvailableConstruction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
Posted Date
Nov 24, 2025
Due Date
Jul 2, 2026
The project includes the construction of one (1) new hangar facility on the south end of the terminal building apron of the airport: hangar 4A (approx. 12,000 SF) bids will be received under the following four (4) prime contracts: general construction, HVAC construction, plumbing construction, electrical construction.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
The project includes the construction of one (1) new hangar facility on the south end of the terminal building apron of the airport: hangar 4A (approx. 12,000 SF) bids will be received under the following four (4) prime contracts: general construction, HVAC construction, plumbing construction, electrical construction.
AvailableDemolish existing laundry facilities, including structural, mechanical, electrical, and plumbing elements.
Posted Date
Dec 17, 2025
Due Date
Jan 30, 2026
Release: Dec 17, 2025
Close: Jan 30, 2026
Demolish existing laundry facilities, including structural, mechanical, electrical, and plumbing elements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Close: Jul 2, 2026
Construction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
Available