Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the construction of one (1) new hangar facility on the south end of the terminal building apron of the airport: hangar 4A (approx. 12,000 SF) bids will be received under the following four (4) prime contracts: general construction, HVAC construction, plumbing construction, electrical construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Virginia Highlands Airport Authority is soliciting bids for construction of Hangar Site 4, including earthwork and some paving. The authority invites qualified contractors to perform excavation, grading, and paving work to prepare the site. Contractors should review the buyer’s vendor portal for official documentation and submission instructions.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
The Virginia Highlands Airport Authority is soliciting bids for construction of Hangar Site 4, including earthwork and some paving. The authority invites qualified contractors to perform excavation, grading, and paving work to prepare the site. Contractors should review the buyer’s vendor portal for official documentation and submission instructions.
Premium
Access the largest public sector contact database
Work includes : 1,100 LF installation and removal of silt fence; 55 SY bituminous pavement removal; 150 SY cold milling (2" depth); 185 LF remove pipe; 350 CY muck excavation; 70 LF aviation barricades (contractor furnished); see outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Work includes : 1,100 LF installation and removal of silt fence; 55 SY bituminous pavement removal; 150 SY cold milling (2" depth); 185 LF remove pipe; 350 CY muck excavation; 70 LF aviation barricades (contractor furnished); see outside link.
AvailableWork includes approx. 500 LF of installation and removal of silt fence; 3 EA of installation and removal of inlet protection; 350 CY of unclassified excavation; 1,100 SY 10" crushed aggregate base course; 300 SF of airport pavement marking; 0.50 AC of seeding; 2.420 Sy of mulching;
Posted Date
Mar 21, 2025
Due Date
Jan 8, 2026
Release: Mar 21, 2025
Close: Jan 8, 2026
Work includes approx. 500 LF of installation and removal of silt fence; 3 EA of installation and removal of inlet protection; 350 CY of unclassified excavation; 1,100 SY 10" crushed aggregate base course; 300 SF of airport pavement marking; 0.50 AC of seeding; 2.420 Sy of mulching;
AvailableThe Drug Enforcement Administration (DEA) is soliciting hangar rental services to provide secure hangar space with 24‑hour access to the runway and facility for use during calendar year 2026. The requirement is expected to be awarded on a sole‑source basis to Jet Aviation San Juan, Inc., but the agency is accepting capability statements from other interested vendors. The period of performance is January 1, 2026 through December 31, 2026 and the solicitation shows an open date of 2025‑12‑17 and a close date of 2025‑12‑22.
Posted Date
-
Due Date
Dec 22, 2025
Release: -
Close: Dec 22, 2025
The Drug Enforcement Administration (DEA) is soliciting hangar rental services to provide secure hangar space with 24‑hour access to the runway and facility for use during calendar year 2026. The requirement is expected to be awarded on a sole‑source basis to Jet Aviation San Juan, Inc., but the agency is accepting capability statements from other interested vendors. The period of performance is January 1, 2026 through December 31, 2026 and the solicitation shows an open date of 2025‑12‑17 and a close date of 2025‑12‑22.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis