Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Holston River Soil And Water Conservation District
Work will include renovation of a building, approx 9,000 gross SF in area, with limited associated site work, exterior site lighting and utilities work.
Posted Date
May 31, 2026
Due Date
Jul 1, 2026
Release: May 31, 2026
Holston River Soil And Water Conservation District
Close: Jul 1, 2026
Work will include renovation of a building, approx 9,000 gross SF in area, with limited associated site work, exterior site lighting and utilities work.
AvailableHolston River Soil And Water Conservation District
Work includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Holston River Soil And Water Conservation District
Close: Jan 7, 2026
Work includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
Holston River Soil And Water Conservation District
Work includes : 1,100 LF installation and removal of silt fence; 55 SY bituminous pavement removal; 150 SY cold milling (2" depth); 185 LF remove pipe; 350 CY muck excavation; 70 LF aviation barricades (contractor furnished); see outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Holston River Soil And Water Conservation District
Close: Jan 7, 2026
Work includes : 1,100 LF installation and removal of silt fence; 55 SY bituminous pavement removal; 150 SY cold milling (2" depth); 185 LF remove pipe; 350 CY muck excavation; 70 LF aviation barricades (contractor furnished); see outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Holston River Soil And Water Conservation District
The Holston River Soil & Water Conservation District's long-term plan aims to promote the wise use and protection of natural resources within its boundaries. The plan focuses on four main categories: improving water quality in agriculture, implementing urban/residential non-point source pollution reduction programs, creating environmental educational opportunities for public, youth, and adults, and enhancing government interaction and internal organizational effectiveness. The vision is to become more visible as an organization dedicated to the protection of all natural resources, with a primary concern for conserving prime farmland, surface and ground water, air, forests, and urban areas through communication and cooperation with various stakeholders.
The meeting addressed several key areas, including the treasurer's report, NRCS report, DCR CDC report, and forestry report. The board approved Lance Yates as Conservation Specialist/Education Specialist. They also approved expenses for the Area IV Spring Meeting and changed the March meeting time and location to coincide with it. Health insurance options were discussed, and the KA 250 plan was approved with an 80/20 split for individual plans. The district will cover the complete portion of the VRS Life Insurance. The District Technical report included the transfer of a contract and the cancellation of another. Additionally, travel and registration expenses were approved for the VFGC Grazing School and the VA Cover Crop College. The District Educational report led to the approval of Envirothon expenses and sponsorships for students to attend Camp Woods and Wildlife and Youth Conservation Camp. Several TMDL Residential cost-share contracts were also approved.
The meeting included a review of the Treasurer's Report for December 2018, an NRCS report providing technical assistance updates to Washington County landowners, and a DCR CDC report with updates on administrative and operational items. The committee recommended offering the Conservation Specialist/Education Specialist position to Lance Yates. The District Technical report was presented, including the approval of cost-share payments. Additionally, the District TMDL report was discussed, leading to the approval of TMDL Residential cost-share contracts and payments.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Holston River Soil And Water Conservation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge