Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Lavon is soliciting bids to expand the Bear Creek Wastewater Treatment Plant from 0.50 MGD to 0.75 MGD as Phase 4. The work includes a new lift station with mechanical bar screens and submersible pumps, additional aeration/digester tanks, a chlorine contact basin, blowers, and associated piping, electrical, controls, site work, and appurtenances. A non‑mandatory pre‑bid will be held on January 29 2026, and bids are due February 5 2026 at 10:00 AM CST at Lavon City Hall.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 2, 2026
Close: Feb 3, 2026
WWTP Expansion & Major Upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes traffic signals. 865 LF trench; 10,005 LF conduit, jacked or drilled, 725.052, 2"; 555 LF power cable, 3-conductor, #6 awg; 6,935 LF signal cable, 3-conductor, no. 14 awg; 15 EA fiber optic drop cable, 12sm lc/upc; 19,285 LF fiber optic cable, 72sm; 134 SF sign erected, flat sheet; 3,465 SF 4" concrete sidewalk, including restoration; 940 SF 6" concrete curb ramp; 5 LF edge line, 4" white.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Work includes traffic signals. 865 LF trench; 10,005 LF conduit, jacked or drilled, 725.052, 2"; 555 LF power cable, 3-conductor, #6 awg; 6,935 LF signal cable, 3-conductor, no. 14 awg; 15 EA fiber optic drop cable, 12sm lc/upc; 19,285 LF fiber optic cable, 72sm; 134 SF sign erected, flat sheet; 3,465 SF 4" concrete sidewalk, including restoration; 940 SF 6" concrete curb ramp; 5 LF edge line, 4" white.
AvailableServices include harvest and staging of trees, construction of large wood structures, excavation of material to construct side channels and fill for main stem, and project habitat restoration elements. The stream restoration elements will address the limiting factors for all life stages of Chinook salmon, steelhead, bull trout, and other native species within the project reach.
Posted Date
Oct 30, 2025
Due Date
Feb 2, 2026
Release: Oct 30, 2025
Close: Feb 2, 2026
Services include harvest and staging of trees, construction of large wood structures, excavation of material to construct side channels and fill for main stem, and project habitat restoration elements. The stream restoration elements will address the limiting factors for all life stages of Chinook salmon, steelhead, bull trout, and other native species within the project reach.
AvailableWork includes WWTP chemical phosporus removal improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work includes WWTP chemical phosporus removal improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →