Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Corpus Christi
Supply, ultrasonic or electromagnetic large flow meters. Additionally, flow meters shall be compatible with Aclara's AMR (automated meter reading) system. Includes 2 each 6" ultrasonic or electromagnetic flow meter; 2 each 8" ultrasonic or electromagnetic flow meter; see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Corpus Christi
The City of Corpus Christi is soliciting sealed bids for construction of a 30,000 sq ft. water warehouse comprising interior offices and rack storage, featuring a concrete tilt‑wall, steel frame, insulated glass storefront, TPO roof, and metal canopies. Bids are due January 21, 2026 at 2:00 PM CST.
Posted Date
Nov 21, 2025
Due Date
Jan 21, 2026
Release: Nov 21, 2025
City of Corpus Christi
Close: Jan 21, 2026
The City of Corpus Christi is soliciting sealed bids for construction of a 30,000 sq ft. water warehouse comprising interior offices and rack storage, featuring a concrete tilt‑wall, steel frame, insulated glass storefront, TPO roof, and metal canopies. Bids are due January 21, 2026 at 2:00 PM CST.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Germantown Purchasing Division
Provide qualified engineering firms - the selected firm will provide technical analysis, detailed designs, construction drawings, specifications, and secure necessary site plan approvals for installing permanent sanitary sewer flow meters. These meters will be placed at all points where the sewer collection system discharges into the sewer system. The project involves designing sanitary sewer flow meters and sensors to measure effluent flow in gallons through the sanitary sewer outfall lines to sewer treatment facilities. Additionally, these flow meters will be utilized for inflow & infiltration (i&i) studies. These studies will measure, identify, and quantify unwanted water entering the sewer system during weather events, aiding in pinpointing problem areas, prioritizing repairs, and enhancing overall system efficiency and capacity.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Germantown Purchasing Division
Close: Dec 10, 2025
Provide qualified engineering firms - the selected firm will provide technical analysis, detailed designs, construction drawings, specifications, and secure necessary site plan approvals for installing permanent sanitary sewer flow meters. These meters will be placed at all points where the sewer collection system discharges into the sewer system. The project involves designing sanitary sewer flow meters and sensors to measure effluent flow in gallons through the sanitary sewer outfall lines to sewer treatment facilities. Additionally, these flow meters will be utilized for inflow & infiltration (i&i) studies. These studies will measure, identify, and quantify unwanted water entering the sewer system during weather events, aiding in pinpointing problem areas, prioritizing repairs, and enhancing overall system efficiency and capacity.
AvailableCity of Pomona
Purchase of large ultrasonic water meters on an as-needed basis.
Posted Date
Nov 25, 2025
Due Date
Dec 15, 2025
Release: Nov 25, 2025
City of Pomona
Close: Dec 15, 2025
Purchase of large ultrasonic water meters on an as-needed basis.
AvailableCity of Oklahoma City
Qualified firms to provide Process Flow Meters for the Line Maintenance Division of the Utilities Department as provided for herein.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
City of Oklahoma City
Close: Dec 10, 2025
Qualified firms to provide Process Flow Meters for the Line Maintenance Division of the Utilities Department as provided for herein.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →