FederalPA
Jul 22, 2026
Closes
Aug 7, 2026
DDSP Boiler Repairs - SP3300-26-Q-0221 - Request for Quotation
Ruptured and Adjacent Waterwall Tube Replacement - Boiler #2 The Contractor shall perform the following tasks to replace the ruptured tube section and the previously repaired adjacent tube section in Boiler #2. Site Assessment and Preparation: Conduct a pre-job site visit to visually inspect the damaged tube, the previously repaired adjacent tube, and the surrounding area. Verify the exact location of the rupture and the adjacent tube requiring replacement. See attached file.