Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
AvailableThe Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableThe City of Pelham, Alabama is soliciting sealed proposals for construction improvements to the Eagle Cove sanitary sewer lift station. The project entails rehabilitation and upgrade work to the lift station and associated appurtenances, delivered as a public works construction contract. Bids are due to the City by January 8, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
The City of Pelham, Alabama is soliciting sealed proposals for construction improvements to the Eagle Cove sanitary sewer lift station. The project entails rehabilitation and upgrade work to the lift station and associated appurtenances, delivered as a public works construction contract. Bids are due to the City by January 8, 2026 at 2:00 PM local time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis