Central Arkansas Water, Southwest Section
Special DistrictAR
Aug 9, 2026
Closes
Aug 27, 2026
Lake Maumelle Intake Pump Station Pavement Improvements RFP
Provide pavement improvements approx 3,000 SY of 2" asphalt overlay.
Description: Central Arkansas Water is soliciting sealed bids for pavement improvements at the Lake Maumelle Intake Pump Station in Roland, Arkansas. The work consists of approximately 3,000 square yards of 2-inch asphalt overlay, with an on-site pre-bid meeting scheduled for August 20, 2026. Bids must be received by 10:00 A.M. on August 27, 2026, and must include a certified check or bid bond equal to at least 5% of the total bid.
SpecialDistrict · AR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Central Arkansas Water, Southwest Section
Special DistrictAR
Aug 9, 2026
Closes
Aug 27, 2026
Provide pavement improvements approx 3,000 SY of 2" asphalt overlay.
CountyGA
Jul 30, 2026
Closes
Sep 1, 2026
The Lowndes County Board of Commissioners is seeking sealed bids for Pump Station Improvements - Permanent Bypass Pump Installation. The work includes installing a permanent bypass pump and associated equipment for the county sewer system. This is a competitive procurement, not a grant program, and requires Georgia utility-contractor licensing, bid and performance/payment bonds, E-Verify participation, and attendance at a mandatory pre-bid meeting; the project is funded in part by a Georgia Fund loan administered by GEFA.
CityWA
Aug 5, 2026
Closes
Aug 25, 2026
Work to be performed includes: replacement of the existing booster pump station pump skid with a new pump skid, site work including upsizing the booster pump station’s suction and discharge piping, and utilities including site telemetry upgrades and power distribution improvements. The construction project also requires system bypass to keep auxiliary pressure zones in service during the duration of construction.
CityTN
-
Closes
Aug 25, 2026
Work consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all Work required to construct complete, in place, and ready to operate the following: Replace existing pump station with a new duplex suction-lift arrangement with two (2) 7.5 HP pumps.
Procurement and program contacts connected to Central Arkansas Water.