Retrieving RFP details
Release
Close
Lake Country School District
Mill and replacement of existing asphalt parking lot with new asphalt. Restripe parking lot to maximize parking quantity and efficiency of drop-off / pick-up vehicle circulation, coordinate layout closely with district. Include all paint striping. Replace existing concrete sidewalk with new concrete surfaces. Replacement of the existing concrete curb and gutter with new concrete 18" curb and gutters. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended). See attached file.
LCSD - RFP - Site Improvements
Troy School District
Provide site improvements and paving work.
Kenosha Unified School District 1
Work includes, but is not limited asphalt and concrete demolition, storm sewer piping and retention areas, concrete curb and gutter, asphalt pavement and concrete flat work, site lighting, pavement markings, landscape restoration.
Lake Country School District
Replace all existing VAV boxes building-wide. Scope to include any associated ductwork replacement needed, relocation of boxes from in-classrooms (where applicable) to hallways, and relocation of boxes that are blocked by current location in the ceiling. See attached file.
Release
Oct 17, 2025
Close
Nov 17, 2025