Summary
Project description: division 1 - alternate 1- main tile improvement - R.C.P. Division 1, alternate 1, consists of approx., 9,300 LF of 60" diameter RCP tile, 680 LF of 54" diameter RCP tile, 400 LF of 48" diameter RCP tile, cross connections with the existing tile, connections of both existing private tile and district facilities to the new tile, placing trench foundation stone, all related structures and/or fabricated tile elbows, surface restoration including 12" minimum of tillage with rock disposal or all disturbed working area, and 5 stations of open ditch excavation including spoil bank leveling and seeding. Division 1 - alternate 2- main tile improvement - HDPE division 1, alternate 2, consists of approx., 10,000 LF of 60” diameter HDPE tile, 460 LF of 48" diameter tile, cross connections with the existing tile, connections of both existing private tile and district facilities to the new tile, placing trench foundation stone, all related structures and/or fabricated tile elbows, surface restoration including 12" minimum of tillage with rock disposal or all disturbed working area, and 5 stations of open ditch excavation including spoil bank leveling and seeding. Division 2 - county road crossing - 130th avenue. Division 2 consists of approx., 66 LF of 60" diameter RCP tile open cut installation, road ditch seeding, traffic control, and all related structures and/or fabricated tile elbows. Division 3 - county road crossing - 400th street division 3 consists of approx., 99 LF of 60" diameter RCP tile open cut installation, road ditch seeding, traffic control, and all related structures and/or fabricated tile elbows.