Retrieving RFP details
Release
Close
City of Valdosta
Installation and construction of a sanitary sewage lift station, installation of about 2,200 LF of new gravity sanitary sewer, installation of about 5,800 LF of sewer force main, and other demolition, repair and patching, grading, grassing, and all related work. The Goodyear work consists of installation and construction of a sanitary sewage lift station, installation of about 500 LF of new gravity sanitary sewer, installation of about 750 LF of sewer force main, about 150 LF of watermain, and other demolition, repair and patching, grading, grassing, and all related work. Goodyear Pump Station Modifications consisting of: Relocate the existing Goodyear raw sewage pump station, construct wetwell, pad, site improvements, pumps, generator and automatic transfer switch electrical including panel, VFD and electrical systems, paint, piping and fencing, complete with appurtenances.
Knights Academy Road/Goodyear Lift Station (IFB)
zip
City of Eau Claire
Work includes installation of premanufactured lift station, sanitary sewer and force main, sanitary sewer submersible lift station, above grade valve vault, switch gear frame and electrical work, un-classified excavation, grading and graveling, and restoration.
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Tohopekaliga Water Authority
Supply and delivery of pumps, pump base plates, floats, transducers, control panel, and other miscellaneous items for S057.
Release
Oct 30, 2025
Close
Dec 02, 2025