School DistrictOR
Posted
Nov 17, 2026
Dec 17, 2026
Ed Center Kitchen Remodel RFP
Work consists of Kitchen and cold storage renovation. Alternate work includes security fencing and outdoor basketball court for the ECCO school.
Description: The Town of Belgrade is soliciting sealed bids from qualified contractors to fully remove, dispose of, replace, and finish the kitchen at the Center for All Seasons, including sheetrock, insulation, cabinetry, and the drop ceiling. The work includes remediation of mold- and mildew-damaged materials, installation of moisture-resistant sheetrock and rockwool insulation, replacement cabinets in a similar layout, cleaning and sealing the existing tile floor, and installation of vinyl drop-in ceiling tiles; plumbing coordination with the municipality's contracted plumber and disposal of debris at the town transfer station are required. Bidders must conduct a site visit prior to submission and provide an itemized price, schedule to complete work between February 27, 2027 and April 27, 2027, proof of insurance, and three professional references.
City · ME, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
8 days before RFP
The Selectboard record reported that kitchen mold remediation exceeded the bid threshold and staff were preparing an RFP for the work.
The other the other part of it, which is addressing the mold in the kitchen, is going to be much more expensive and above the $15,000 threshold and will require um you know going out to bid. Um my opinion is that the basically the insurance company is using um a date of loss date for the claims. Right now they're using a March 27th date. The mold issue in…
Selectboard Special Meeting
Board meeting · Nov 10, 2026
Kitchen Replacement - Center for All Seasons Town of Belgrade Center for All Seasons 1 Center Drive Belgrade, Maine 04917 The Town of Belgrade is requesting sealed bids from qualified contractors for kitchen replacement work at the Center for All Seasons. Project Schedule RFP opens: Wednesday, November 18, 2026 Sealed bids due: Thursday, December 10, 2026,…
Board of Selectpersons Meeting Agenda
Agenda packet · Nov 17, 2026
RFP published
Proposals due (16 days left)
Decision makers connected to this RFP from Town of Belgrade.
Adjacent opportunities open for bidding right now.
School DistrictOR
Posted
Nov 17, 2026
Dec 17, 2026
Work consists of Kitchen and cold storage renovation. Alternate work includes security fencing and outdoor basketball court for the ECCO school.
Willis Independent School District
School DistrictTX
Posted
Nov 18, 2026
Dec 11, 2026
Willis Independent School District issues this request for proposals for the purpose of identifying a vendor(s) to supply Kitchen Serving Line Replacement at Willis High School to support the needs of the District, in accordance with the terms, conditions and specifications established within this Request for Proposals. Proposals are due on or before 3:00 pm (CST) on December 11, 2026. An award recommendation will be made at the Willis ISD Board of Trustees meeting schedule on February 10, 2027. Willis ISD uses an online bidding system to post and receive bids electronically. To view the full specifications of this RFP and to submit a proposal, you must be registered as a vendor within our online system and must log in.
Charleston-Kanawha Housing Authority
Special DistrictWV
Posted
Nov 6, 2026
Dec 10, 2026
The work consists of but is not limited to the replacement of kitchens, flooring, lighting, painting and all associated work for a complete project.
CityFL
Posted
Nov 17, 2026
Dec 16, 2026
The City of Hialeah seeks a qualified contractor to remove and dispose of existing tile and install replacement porcelain tile in the Fire Station #4 kitchen. The scope covers 144 square feet of floor tile and 432 square feet of wall tile, along with site protection, substrate preparation, installation, grouting, and cleanup. The new tile and layout require approval by the Construction & Maintenance Department, and all work must comply with applicable building codes and manufacturers’ installation instructions.