Summary
Work includes roof replacement: ensures the hose tower structure and substrate can support a new tpo membrane. ; inspect existing roof deck (steel, concrete, or wood); document moisture intrusion or membrane failure; verify parapet and tower wall conditions; identify penetrations: hose-drying vents, exhaust fans, lightning protection; remove existing roofing; remove existing membrane and insulation; dispose of materials per municipal waste requirements; protect hose-drying equipment inside the tower;' temporarily weatherproof the opening if removal spans multiple days; provides thermal performance and a smooth surface for membrane adhesion. See outside link.