Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to replace 2,000' of 3" water main. The project scope involves the furnishing and installation of 2,080' of 3" HDPE water main installed via open cut, three 3" gate valves, and reconnecting five water meter service lines to the new water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableProject involves replacing approx 700 LF of existing 4" iron water main with new 8" polyethylene encased ductile iron water main.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Project involves replacing approx 700 LF of existing 4" iron water main with new 8" polyethylene encased ductile iron water main.
AvailableRelease: Oct 23, 2025
Close: Feb 3, 2026
Parkway phase 1 - construction project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.