School DistrictMI
Posted
Nov 20, 2026
Dec 15, 2026
Marysville High School Partial Roof Replacement RFP
Marysville High School Partial Roof Replacement
Description: Project includes a partial re-roof where the membrane and insulation will be removed down to the existing deck, and new insulation, coverboard, and membrane will be installed, including all associated work at school.
SchoolDistrict · IL, US
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
School DistrictMI
Posted
Nov 20, 2026
Dec 15, 2026
Marysville High School Partial Roof Replacement
Ankeny Community School District
School DistrictIA
Posted
Nov 17, 2026
Dec 16, 2026
Project consists of partial re-roofing on two sites to remove existing fully adhered EPDM roof membrane, any wet insulation and all perimeter membrane and metal flashing and install new 2" thick screw fasten roof insulation, 1/2" thick high density polyisocyanurate cover board fastened with low rise foam adhesive and fully adhered EPDM 90 mil roof membrane and new prefinished metal roof edge flashing for approx 26,000 SF of roof area. Provide minor miscellaneous masonry restoration repairs on masonry walls above low roofs prior to in-stalling new roofs.
School DistrictAK
Posted
Nov 20, 2026
Dec 14, 2026
Anchorage School District is soliciting sealed bids for the Central Middle School Roof & Structure Upgrades, a construction contract to replace and upgrade roofing and associated structural elements at Central Middle School in Anchorage, Alaska. The work scope includes roof system replacement (EPDM and related assemblies), structural upgrades including dragstrut ties between roof areas IW and J, hazardous materials abatement (including asbestos), and associated architectural, mechanical, electrical and site work as detailed in the drawings and technical specifications. The estimated construction cost is between $5,000,000 and $10,000,000; the solicitation requires a 5% bid bond and the successful bidder must furnish 100% performance and payment bonds.
School DistrictAR
Posted
-
Nov 24, 2026
Re-roofing of Clinton Primary School for Hope Public Schools in Hope, Arkansas.
Decision makers connected to this RFP from Kewanee Community Unit School District 229.