Shoal Creek Wastewater Treatment Plant Clarifier Addition
The work consists of the addition of a clarifier, flow diversion junction box, piping, earthwork, and ancillary work.
Description: Project includes approx. of the construction of a new final clarifier and splitter box and associated piping from existing oxidation ditch to the new clarifier and an existing final clarifier. Additional site piping is also included along with sludge pumping and piping additions and modifications. Plant electrical improvements and refurbishment of the existing final clarifier are also included.
IndigenousGovernment · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMO
Posted
Aug 22, 2026
Sep 17, 2026
The work consists of the addition of a clarifier, flow diversion junction box, piping, earthwork, and ancillary work.
Harrison County Utility Authority
Special DistrictMS
Posted
Aug 9, 2026
Sep 10, 2026
Harrison County Utility Authority seeks electronic bids for the SOUTH GULFPORT WASTEWATER TREATMENT PLANT CLARIFIER REHABILITATION PROJECT. The work generally consists of removing, rebuilding, and replacing the mechanical equipment within one primary clarifier at the South Gulfport Wastewater Treatment Plant, with bids publicly read after the deadline at the Authority's board room in Gulfport. Contractors must register with HCUA's electronic bidding service provider to obtain the bid documents, which the notice says may be downloaded from phbidding.com.
CityNY
Posted
Aug 26, 2026
Oct 1, 2026
Work includes replacement of two (2) existing digester boilers with new cast-iron dual fuel boilers (digester gas and natural gas), replacement of gas safety equipment and piping, new gas conditioning equipment for moisture removal from the digester gas, and ancillary equipment.
CityNY
Posted
Aug 26, 2026
Oct 1, 2026
Work includes replacement of two (2) existing digester boilers with new cast-iron dual fuel boilers (digester gas and natural gas), replacement of gas safety equipment and piping, new gas conditioning equipment for moisture removal from the digester gas, and ancillary equipment.
Decision makers connected to this RFP from Menominee Indian Tribe of Wisconsin.