Open RFPKatella Ave & State College Blvd Rehabilitation RFP
Description: Work consist of 47,484 sy of cold mill 3" below exist. A. C. Pavement, 2,710 sy of cold mill 5" below exist. A. C. Pavement to accommodate the proposed rehab, 17,120 sy of cold mill 8" below exist. A. C. Pavement to accommodate the proposed rehab, 9,590 ton of asphalt concrete 2. 5" cap (arhm), 50,125 sy of construct 0. 5" aram, 6,895 ton of construct variable depth asphalt concrete, 8 ea of remove exist. Curb ramp, curb, curb & gutter and sidewalk & reconstruct pcc access ramp per coa std. 111-3, with cast-inplace detectable warning device, 1,425 sf of remove exist. Surface & reconstruct 0. 33'(4") depth pcc sidewalk. See attached file.