Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Polk County
Remove and replace gas-fired/electric water heaters with plate frame heat exchanger system(s) for domestic water heating. Provide hydronic pumps and controls for new systems.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clark County
Clark County's Invitation for Bid requests replacement of the Regional Justice Center central plant chilled water pumps, chiller valves, and condenser water strainer, including removal and replacement of multiple chiller isolation valves and pumps, associated hydronic piping, insulation, pressure gauges, and t-strainer baskets, plus related structural and electrical/mechanical work. A pre-bid conference and site walk are scheduled and the bid opening will be held via Webex; contact details and schedule dates are listed on the posting.
Posted Date
Oct 8, 2025
Due Date
Dec 9, 2025
Release: Oct 8, 2025
Clark County
Close: Dec 9, 2025
Clark County's Invitation for Bid requests replacement of the Regional Justice Center central plant chilled water pumps, chiller valves, and condenser water strainer, including removal and replacement of multiple chiller isolation valves and pumps, associated hydronic piping, insulation, pressure gauges, and t-strainer baskets, plus related structural and electrical/mechanical work. A pre-bid conference and site walk are scheduled and the bid opening will be held via Webex; contact details and schedule dates are listed on the posting.
AvailableClark County
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
Posted Date
Oct 8, 2025
Due Date
Apr 30, 2026
Release: Oct 8, 2025
Clark County
Close: Apr 30, 2026
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
AvailableKent County
Work includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Kent County
Close: Dec 19, 2025
Work includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
AvailableTroop Support's Construction & Equipment
2 ea, heater, water, liquid, NSN: 4520012061291.
Posted Date
Nov 13, 2025
Due Date
Nov 24, 2025
Release: Nov 13, 2025
Troop Support's Construction & Equipment
Close: Nov 24, 2025
2 ea, heater, water, liquid, NSN: 4520012061291.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis