Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The vendor shall provide the steam hot water heater and all required installation appurtenances meeting the following specifications: The semi-instantaneous water heater shall be steam heated. Input and output are 2-1/2”. Steam pressure is reduced from 70psi to 27psi by way of a 2” pressure reducer. The water heater shall be capable of heating 45 GPM water from 40° to 140̈°. Vendor shall provide an electric valve. Electric Valve shall interface (read only, not control) with the VA’s Building Management System (BMS). Proposed water heater shall be provided with all fittings and accoutrements for a “Plug and Play” switch out with the existing fit-up.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Commercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Commercial water heater replacement.
AvailableReplacement Steam-Fired Water Heater.
Posted Date
Jan 8, 2026
Due Date
Jan 16, 2026
Release: Jan 8, 2026
Close: Jan 16, 2026
Replacement Steam-Fired Water Heater.
AvailableReplacement of waste oil heater.
Posted Date
Nov 21, 2025
Due Date
Jan 30, 2026
Release: Nov 21, 2025
Close: Jan 30, 2026
Replacement of waste oil heater.
AvailableReplacement of retaining wall along route 44. Work includes 575 LF Of 16" ductile iron pipe; 585 LF of insulated 8" ductile iron water main; 640 LF Of Cured in placed pipe lining 8" (sanitary sewer).
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Replacement of retaining wall along route 44. Work includes 575 LF Of 16" ductile iron pipe; 585 LF of insulated 8" ductile iron water main; 640 LF Of Cured in placed pipe lining 8" (sanitary sewer).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis