Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Enlarge two wastewater lagoons, replace existing piping and manhole, install a valve, and supply and install 60-mil HDPE geomembrane liners.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This Invitation to Tender is for the supply of a Lagoons Aeration Blower, specifically a Kaeser HBS 1600 Sigma screw blower package, including installation, documentation, and training.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This Invitation to Tender is for the supply of a Lagoons Aeration Blower, specifically a Kaeser HBS 1600 Sigma screw blower package, including installation, documentation, and training.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Bolton, Vermont is soliciting bids for construction to upgrade the Bolton Valley Community Water and Sewer wastewater treatment facility. The project includes new headworks and pump station, a pre‑equalization tank, a new SBR system, an operations building with filtration and UV disinfection, chemical storage and feed systems, laboratory and office space, and demolition of existing structures. Bidding documents are made available via the engineer’s bid portal (Hoyle Tanner) through QuestCDN, and bids are due March 5, 2026.
Posted Date
Jan 19, 2026
Due Date
Mar 5, 2026
Release: Jan 19, 2026
Close: Mar 5, 2026
The Town of Bolton, Vermont is soliciting bids for construction to upgrade the Bolton Valley Community Water and Sewer wastewater treatment facility. The project includes new headworks and pump station, a pre‑equalization tank, a new SBR system, an operations building with filtration and UV disinfection, chemical storage and feed systems, laboratory and office space, and demolition of existing structures. Bidding documents are made available via the engineer’s bid portal (Hoyle Tanner) through QuestCDN, and bids are due March 5, 2026.
AvailableThe City of Gretna requests Statements of Qualifications for professional engineering services to perform repairs and upgrades to the Burmaster Boulevard Wastewater Treatment Plant, including work on a digester tank, centrifuge hoist, SCADA system, and new headworks screen. The selected firm must demonstrate multidisciplinary engineering experience and have Louisiana-registered professional engineers; submittals must follow Jefferson Parish’s TEC Questionnaire. The contract is expected to be partially funded by a U.S. EPA grant and the work is anticipated to be completed within approximately eight months.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
The City of Gretna requests Statements of Qualifications for professional engineering services to perform repairs and upgrades to the Burmaster Boulevard Wastewater Treatment Plant, including work on a digester tank, centrifuge hoist, SCADA system, and new headworks screen. The selected firm must demonstrate multidisciplinary engineering experience and have Louisiana-registered professional engineers; submittals must follow Jefferson Parish’s TEC Questionnaire. The contract is expected to be partially funded by a U.S. EPA grant and the work is anticipated to be completed within approximately eight months.
AvailableSludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.