Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dalton Sewer Authority
Wastewater treatment plant upgrade: contract 2 structural/ mechanical contract 3: electrical, contract 4: HVAC. Contract Nos. 2, 3 and 4 consists of work to construct a new influent triplex pumping station, new packaged wastewater treatment plant, new tertiary building with copper filters and UV disinfection, new blowers, new 100,000 gal. surge tank, new surge pumping station, new surge support building, new chemical feed system, new metering chamber, new post aeration tanks, new emergency generator, site grading and drainage improvements, piping, fittings, valves, manholes, electrical, instrumentation and controls, and HVAC work.
Posted Date
Feb 16, 2026
Due Date
Mar 26, 2026
Release: Feb 16, 2026
Dalton Sewer Authority
Close: Mar 26, 2026
Wastewater treatment plant upgrade: contract 2 structural/ mechanical contract 3: electrical, contract 4: HVAC. Contract Nos. 2, 3 and 4 consists of work to construct a new influent triplex pumping station, new packaged wastewater treatment plant, new tertiary building with copper filters and UV disinfection, new blowers, new 100,000 gal. surge tank, new surge pumping station, new surge support building, new chemical feed system, new metering chamber, new post aeration tanks, new emergency generator, site grading and drainage improvements, piping, fittings, valves, manholes, electrical, instrumentation and controls, and HVAC work.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Dalton Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Dalton Sewer Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database