School DistrictIL
Posted
Nov 11, 2026
Nov 24, 2026
Little Village Hs Chiller 2 A2 Compressor Replacement Bid - Open To Contracted Pre-qualified Pool for Various Trades Only
High school chiller 2 A2 compressor replacement.
Description: Replacement of sump pumps.
SchoolDistrict · IL, US
Adjacent opportunities open for bidding right now.
School DistrictIL
Posted
Nov 11, 2026
Nov 24, 2026
High school chiller 2 A2 compressor replacement.
School DistrictIL
Posted
Nov 6, 2026
Nov 24, 2026
Replace approx. 350 ft length of existing chain link fence with new Ornamental fence. See attached files and outside link.
School DistrictIL
Posted
Nov 12, 2026
Nov 24, 2026
Relocating (4) Exhaust Fans. 1) Remove four roof-mounted exhaust fans 2) Remove/reconfigure existing electrical feeds and reroute to the new fan locations. 3) Provide four relief hoods at existing roof fan curbs, with weather-tight attachment and flashing as required. 4) Provide and install four inline centrifugal exhaust fans in the attic where ducts penetrate the roof. 5) Rework ductwork to connect to each new fan and rework electrical connections, including local service/disconnect switches - Exhaust fans to be connected to BAS.
School DistrictIL
Posted
Nov 18, 2026
Dec 1, 2026
See Files for details on walkthroughs, whether walkthroughs are mandatory, contact persons, specifications, instructions, and other details. Bids MUST BE Submitted Electronically here on EUNA/Bonfire. Bid readings are public and held on Google Meet at https://meet.google.com/qos-axae-okm
Decision makers connected to this RFP from Chicago Public Schools.
Solicitation files and supporting documents for this bid.