Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Johnson County Library
Johnson County Library issued Bid Request No. 2025-037 for the Leawood Pioneer Courtyard Improvements project to bring the Leawood branch courtyard into ADA compliance through drainage modifications, brick pavement replacement, improved usability, and new electrical and lighting features. Bids are due Dec. 16, 2025, with a mandatory pre-bid/site visit on Dec. 2, 2025, and electronic submission via the Johnson County IonWave procurement portal.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Johnson County
Work includes improvements to the courtyard will bring the area into ADA compliance through drainage modifications, removal and replacement of brick pavement, enhanced usability, and the addition of new electrical and lighting features.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Johnson County
Close: Dec 16, 2025
Work includes improvements to the courtyard will bring the area into ADA compliance through drainage modifications, removal and replacement of brick pavement, enhanced usability, and the addition of new electrical and lighting features.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mclennan Community College
Cameron Hall Courtyard Project.
Posted Date
Nov 14, 2025
Due Date
Dec 2, 2025
Release: Nov 14, 2025
Mclennan Community College
Close: Dec 2, 2025
Cameron Hall Courtyard Project.
AvailableFairfax County
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Fairfax County
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
AvailablePender County
Pender County is soliciting sealed bids for construction of a new 20,000 square foot Hampstead Library including building and site improvements; the contract will be awarded as a Single Prime and requires a 5% bid bond. Sealed proposals are due by 3:00 p.m. Eastern on December 18, 2025, and electronic contract documents may be obtained from the architect or the architect's website.
Posted Date
-
Due Date
Dec 18, 2025
Pender County
Close: Dec 18, 2025
Pender County is soliciting sealed bids for construction of a new 20,000 square foot Hampstead Library including building and site improvements; the contract will be awarded as a Single Prime and requires a 5% bid bond. Sealed proposals are due by 3:00 p.m. Eastern on December 18, 2025, and electronic contract documents may be obtained from the architect or the architect's website.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →