Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Antioch Unified School District
Work consists of elementary school, electrical underground infrastructure for portables relocation project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
San Francisco Unified School District
San Francisco Unified School District (Project No. 11989) requests bids for the El Dorado Elementary School Green Infrastructure Project, including asphalt removal, stormwater capture systems, and the introduction of native vegetation. Bids are due December 12, 2025 at 2:00 PM local time; the estimated construction cost is $1,500,000 and a Class B General Contractor (or subcontractor with asbestos and lead certification) is required.
Posted Date
Nov 10, 2025
Due Date
Dec 12, 2025
Release: Nov 10, 2025
San Francisco Unified School District
Close: Dec 12, 2025
San Francisco Unified School District (Project No. 11989) requests bids for the El Dorado Elementary School Green Infrastructure Project, including asphalt removal, stormwater capture systems, and the introduction of native vegetation. Bids are due December 12, 2025 at 2:00 PM local time; the estimated construction cost is $1,500,000 and a Class B General Contractor (or subcontractor with asbestos and lead certification) is required.
AvailableSan Francisco Unified School District
The Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
San Francisco Unified School District
Close: Dec 12, 2025
The Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
AvailableCity of Seattle
Underground cable replacement project- owner advisor.
Posted Date
Oct 20, 2025
Due Date
Nov 24, 2025
Release: Oct 20, 2025
City of Seattle
Close: Nov 24, 2025
Underground cable replacement project- owner advisor.
AvailableUniversity Of Minnesota Twin Cities
Provide design-build services for replacement and upgrade of the existing building electrical service infrastructure.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
University Of Minnesota Twin Cities
Close: Dec 17, 2025
Provide design-build services for replacement and upgrade of the existing building electrical service infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis