U.S. Army Engineer District Portland
FederalOR
Aug 5, 2026
Closes
Aug 19, 2026
TDA Tainter Valve (TV1) Repair (Request for Quotes) Portland
Provide TDA Tainter Valve (TV1) repair. The scope of this project is to furnish all labor, materials, and equipment to perform the comprehensive rehabilitation of the Tainter valve. The reinstallation work is to be performed inside of the navigation lock fill culverts. See attached file.