Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes restoration of shoreline and repair of ship’s basin jetty and berm.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes the replacement of the gatehouse roof clapboards, ten (10) palisade posts, and two (2) wooden gates.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work includes the replacement of the gatehouse roof clapboards, ten (10) palisade posts, and two (2) wooden gates.
AvailablePremium
Access the largest public sector contact database
Fairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
Posted Date
Dec 5, 2025
Due Date
Dec 22, 2025
Release: Dec 5, 2025
Close: Dec 22, 2025
Fairfax County issued IFB 25002 for construction of a duct bank to relocate overhead utilities via underground installation along Main Street in the Town of Clifton. The procurement seeks qualified contractors experienced in utility infrastructure and requires compliance with the solicitation’s technical specifications and terms. Bids are due December 22, 2025, and the solicitation is structured as a competitive sealed bidding IFB.
AvailableAccepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailableThe salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis