City of Tega Cay
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Three Rivers Park District
Project consists of shoreline stabilization including installation of rip-rap, vegetated rip-rap. Site improvements to include concrete stairs and trails, aggregate trails, stone retaining walls site grading and restoration at multiple access points along the river edge. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
Three Rivers Park District
Close: Dec 2, 2025
Project consists of shoreline stabilization including installation of rip-rap, vegetated rip-rap. Site improvements to include concrete stairs and trails, aggregate trails, stone retaining walls site grading and restoration at multiple access points along the river edge. See outside link.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Nov 20, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableIowa Department of Natural Resources
Work includes 7,615 tons shoreline treatment, rip rap (class E); 152 SY stabilized construction exit; 890 LF filter sock removal; 750 LF filter sock, 9"; 30 SY special subgrade, prep for shared use path; 30 SY shared use path, PCC, 6"; installation and removal of staging area.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Iowa Department of Natural Resources
Close: Nov 20, 2025
Work includes 7,615 tons shoreline treatment, rip rap (class E); 152 SY stabilized construction exit; 890 LF filter sock removal; 750 LF filter sock, 9"; 30 SY special subgrade, prep for shared use path; 30 SY shared use path, PCC, 6"; installation and removal of staging area.
AvailableCity of Superior
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
City of Superior
Close: Dec 16, 2025
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis