Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes roof renovation shingle & low-slope roofing replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Shingle and EPDM roof replacement.
Posted Date
Jan 21, 2026
Due Date
Mar 6, 2026
Release: Jan 21, 2026
Close: Mar 6, 2026
Shingle and EPDM roof replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking for the removal and replacement of the current asphalt shingle roof.
Posted Date
Jan 22, 2026
Due Date
Feb 4, 2026
Release: Jan 22, 2026
Close: Feb 4, 2026
Seeking for the removal and replacement of the current asphalt shingle roof.
AvailableWork consists of replace existing low slope roofing with KEE-Stone roofing system. Replace existng shingle roofing with new dimensional shingles and R-Mer seal underlayment. Replace metal roof with cool sil metal restoration system.
Posted Date
Dec 21, 2025
Due Date
Jan 30, 2026
Release: Dec 21, 2025
Close: Jan 30, 2026
Work consists of replace existing low slope roofing with KEE-Stone roofing system. Replace existng shingle roofing with new dimensional shingles and R-Mer seal underlayment. Replace metal roof with cool sil metal restoration system.
AvailableRoof replacement work. Removal of old, unused vent piping with roof patching. A full tear off and replacement of the existing shingles, underlayment, drip edge, and gutters/downspouts. Contractors should include a unit price (sf) for ½” CDX deck replacement in their bids. Shingles should be equal to Certainteed Landmarks, GAF Timberline HDZs, or Owens Corning Durations. Synthetic underlayment and ice and watershield to be installed per the shingle manufacturer’s instructions. Drip edge and gutter colors to be standard colors. Bid scope includes waste removal & disposal.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
Roof replacement work. Removal of old, unused vent piping with roof patching. A full tear off and replacement of the existing shingles, underlayment, drip edge, and gutters/downspouts. Contractors should include a unit price (sf) for ½” CDX deck replacement in their bids. Shingles should be equal to Certainteed Landmarks, GAF Timberline HDZs, or Owens Corning Durations. Synthetic underlayment and ice and watershield to be installed per the shingle manufacturer’s instructions. Drip edge and gutter colors to be standard colors. Bid scope includes waste removal & disposal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →