Dec 3, 2026
2027 Water Treatment Plant Chemical RFP
Supply of liquid chlorine, potassium permanganate, powdered activated carbon and liquid ammonium sulfate.
Description: Provide and install new baffle walls in the active. Additional parameters require furnishing and installing chlorine, pH, and turbidimeter analyzers, furnishing and installing chemical bulk storage tanks, and installing owner-provided chemical feed skids. The work features full furnishing, installation, programming, and SCADA integration of all instrumentation/control equipment while maintaining seamless facility water treatment operations.
City · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Delray Beach.
Adjacent opportunities open for bidding right now.
CityKS
Posted
Oct 27, 2026
Dec 3, 2026
Supply of liquid chlorine, potassium permanganate, powdered activated carbon and liquid ammonium sulfate.
CityMO
Posted
-
Nov 24, 2026
Upgrade the City’s water treatment plant SCADA system, including control panels, PLCs, HMIs, network equipment, installation, programming, testing, and training across the plant and associated well and water tower sites.
CityOH
Posted
-
Nov 20, 2026
The City of Newton Falls seeks bids for the annual supply of chemicals for its Water Treatment Plant. Bids must be submitted to the City Clerk's office by 10:00 a.m. on Friday, November 20, 2026, and will be publicly opened and read aloud; specifications are available at the Clerk's office during regular business hours. Bidders must include a certified check or bid bond for 5% of the total bid price, may bid on the full specification sheet or individual items, and will be evaluated on the lowest, best, and most responsible offer.
CityFL
Posted
Oct 26, 2026
Dec 3, 2026
Work includes rehabilitation of existing chemical storage and containment areas, major work elements include demolition, disposal, surface preparation, and recoating of the existing ms/ro bulk chemical storage area; furnishing and installing a new chemical-resistant coating system within the bulk storage containment area; rehabilitation and recoating of the existing sump area; and replacement of the existing pump-out system, including associated piping, valves, electrical, controls, testing, and appurtenances required to provide a complete and operational system. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.