Summary
Work includes embankment construction, culvert installation, drainage systems, and related site work includes 2 EA pothole underground utility line; clearing & grubbing (est. Area = 3.1 acres); 19.3 station embankment construction, 22' wide, sta 1+00 to 20+30; 1.4 station embankment construction, 20' wide, STA 100+11 to 101+55; 1 EA cul-de-sac construction, 4,155 SF; 130 LF 18" corrugated steel pipe; 4 EA end section for corrugated steel pipe, 18 inch; 150 LF drainage gallery, 4' wide, 3.5' deep; 27 SF standard sign; seeding, hydraulic method (est. Area = 1.0 acres); 2 EA paved public approach; erosion, sediment and pollution control administration; temporary erosion and pollution control.