Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for site preparation and installation of a corrosion-proof polymer concrete precast wet well, including excavation, assembly, sealing, concrete pours, testing, and backfilling.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
AvailableEquipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailableProvide lift station wet well platform replacement.
Posted Date
Dec 22, 2025
Due Date
Jan 9, 2026
Release: Dec 22, 2025
Close: Jan 9, 2026
Provide lift station wet well platform replacement.
AvailableWet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.