FederalMA
Jul 24, 2026
Closes
Aug 18, 2026
ITB 250349 Building 5222 Boiler Replacement (Camp Edwards, MA)
Remove the two existing failed HTP boilers and install two new HTP ELX-400FBN boilers. One boiler will be set up to run a heating loop to an indirect hot water storage tank. The second heating boiler will be programmed for hot water priority.