Posted
Nov 14, 2026
Dec 3, 2026
Furnish Soda Ash Feed Pump and Motor Assembly Replacement RFP
Furnish soda ash feed pump and motor assembly replacement.
Description: The Municipality of Anchorage is soliciting bids under ITB 2026B095 to furnish a replacement soda ash feed pump and motor assembly for its Anchorage Water and Wastewater Utility Department. The listing directs questions to the Municipality's Purchasing Office and sets a question deadline of November 24, 2026. Bids are due December 3, 2026.
SpecialDistrict · AK, US
Decision makers connected to this RFP from Anchorage Water and Wastewater Utility.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Posted
Nov 14, 2026
Dec 3, 2026
Furnish soda ash feed pump and motor assembly replacement.
Posted
Nov 4, 2026
Nov 24, 2026
Moving Secure Drop Boxes and Anchorage Vote Center election equipment to and from designated locations in Anchorage and Eagle River.
Posted
Oct 20, 2026
Dec 4, 2026
Furnish and deliver one (1) vertical turbine pump as described in the scope of work herein. The brand name and model of the vertical turbine pump must be stated in the "Brand Name/Model Number/Packaging (if applicable)" field by the Offeror. Price must be inclusive of all applicable taxes and F.O.B. shipping fees. Furnish and deliver one (1) motor as described in the scope of work herein. The brand name of the motor must be stated in the "Brand Name/Model Number/Packaging (if applicable)" field by the Offeror. Price must be inclusive of all applicable taxes and F.O.B. shipping fees.
Posted
-
Dec 16, 2026
The Municipality of Anchorage, through Anchorage Water & Wastewater Utility (AWWU), is seeking professional engineering services for the Powder Reserve West Sewer Capacity Improvement Project in Eagle River. The work includes replacing about 2,025 feet of gravity sewer and 250 feet of force main, upgrading a sewer pump station, and performing engineering, permitting, design, and bidding support. The project is intended to improve wastewater-system reliability and capacity, and the design and construction must comply with applicable federal grant requirements.