Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of the project consists of the removal of concrete erosion protection and replacing with ABM erosion protecting. Work will include excavation near utilities and work adjacent to the roadway. Concrete curbing will be required. Also includes 1 LS of removal of structures and obstructions (guard rails and posts); 60 CY of drainage excavation; see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of but not limited to: reconstruction of existing driveways, parking areas and hma & concrete walkways, as well as proposed electrical and drainage work.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Project consists of but not limited to: reconstruction of existing driveways, parking areas and hma & concrete walkways, as well as proposed electrical and drainage work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 7, 2026
Close: Feb 11, 2026
Lane intersection improvements.
AvailableInstallation of approximately 1500 linear feet of 6-inch DR 14 C900 PVC water line, including a regulator station, hydrants, and regrading/drainage correction, on Deception Lane in Jerome, Arizona.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Installation of approximately 1500 linear feet of 6-inch DR 14 C900 PVC water line, including a regulator station, hydrants, and regrading/drainage correction, on Deception Lane in Jerome, Arizona.
AvailableWork consists of reconstruction of west riverside, 40-feet, work includes two-12-foot lanes (1 lane in each direction), curb and gutter, grading and drainage, and concrete driveways. West riverside lane will include sidewalk and ADA wheelchair accessible ramps where feasible.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
Work consists of reconstruction of west riverside, 40-feet, work includes two-12-foot lanes (1 lane in each direction), curb and gutter, grading and drainage, and concrete driveways. West riverside lane will include sidewalk and ADA wheelchair accessible ramps where feasible.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →