Summary
This construction contract, issued by Charlotte Water (City of Charlotte, NC) under reference 2026-Q2(Apr-Jun)-CW-19830, involves stormwater improvements at the Irwin Creek Wastewater Treatment Plant. The scope includes replacing three existing diesel-powered pumps with electric submersible pumps at the existing stormwater outfall locations, installing permanent discharge piping at stormwater outfall 1, and constructing an electrical duct bank with all necessary wiring and components to power the pumps. The project has an estimated total value of $1,000,000 to $4,999,999 and includes bid bond, performance bond, insurance, and MBE/WBE subcontractor utilization requirements.