Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of a deficient bridge with a new single-span concrete box beam bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of water main replacement.
Posted Date
Dec 7, 2025
Due Date
Feb 13, 2026
Release: Dec 7, 2025
Close: Feb 13, 2026
Project consists of water main replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of an existing bridge and the construction of a new 100-foot single span prestressed concrete nu girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
Posted Date
Dec 11, 2025
Due Date
Jan 20, 2026
Release: Dec 11, 2025
Close: Jan 20, 2026
Work includes demolition of an existing bridge and the construction of a new 100-foot single span prestressed concrete nu girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
AvailableThe City of Sacramento solicits bids to construct a new vertical lift bridge over the Sacramento River between Sacramento and West Sacramento, remove obsolete bridges, and perform associated roadway, levee, utility, and trail reconstruction work. The project includes substantial roadway reconfigurations (Bercut Drive, Jibboom Street, Railyards Boulevard, C Street), levee reconstruction to meet design standards, retaining walls, utility relocations, traffic signal and lighting work, and Buy America requirements. The estimated value is approximately $260 million, with a non-mandatory virtual pre-bid meeting and an online Q&A period; responses are due 2026-02-18.
Posted Date
Dec 19, 2025
Due Date
Feb 18, 2026
Release: Dec 19, 2025
Close: Feb 18, 2026
The City of Sacramento solicits bids to construct a new vertical lift bridge over the Sacramento River between Sacramento and West Sacramento, remove obsolete bridges, and perform associated roadway, levee, utility, and trail reconstruction work. The project includes substantial roadway reconfigurations (Bercut Drive, Jibboom Street, Railyards Boulevard, C Street), levee reconstruction to meet design standards, retaining walls, utility relocations, traffic signal and lighting work, and Buy America requirements. The estimated value is approximately $260 million, with a non-mandatory virtual pre-bid meeting and an online Q&A period; responses are due 2026-02-18.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →