CityMN
Aug 11, 2026
Closes
Sep 2, 2026
Bundy/McNally Sewer Lining Project (WINON 190814)
Major quantities for the Work include: 1 LS Mobilization 1 LS Traffic Control; 1 LS Erosion Control and Restoration; 1 LS Temporary Conveyance; 6,855 LF Sanitary Sewer Cleaning; 29 Ea. Point Repair by Chemical Grout; 1 Ea. Point Repair by Excavation; 413 LF 8" Sanitary Sewer CIPP Lining; 3,479 LF 12" Sanitary Sewer CIPP Lining; 2,963 LF 18" Sanitary Sewer CIPP Lining; 44 Ea. Reinstate Sanitary Sewer Lateral Connection; 168 Feet Manhole Rehabilitation.