Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation services for seven sanitary sewer lift stations, including demolition, new pump installation, piping, wet well lining, and electrical modifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes to perform certain renovations, modifications and upgrades to sewage lift stations, piping and pump replacement; bypass pumping; replacing valves and discharge piping; installation of bypass assemblies; construction of valve vaults; installation of guide rails for pump systems; installation of water services at designated stations; replacement of existing wet well tops; installation of scada controls at designated lift stations; along with other associated site work and restoration of all disturbed facilities, existing electrical controls will be removed and replace with new.
Posted Date
Nov 7, 2025
Due Date
Jan 20, 2026
Release: Nov 7, 2025
Close: Jan 20, 2026
Work includes to perform certain renovations, modifications and upgrades to sewage lift stations, piping and pump replacement; bypass pumping; replacing valves and discharge piping; installation of bypass assemblies; construction of valve vaults; installation of guide rails for pump systems; installation of water services at designated stations; replacement of existing wet well tops; installation of scada controls at designated lift stations; along with other associated site work and restoration of all disturbed facilities, existing electrical controls will be removed and replace with new.
AvailableThe University of Illinois at Urbana-Champaign is soliciting sealed bids for Phase 4 of the Oak Street Steam Tunnel Rehabilitation to perform structural, mechanical, electrical, civil, and traffic-control repairs between station mark 000 and 700. A non-mandatory virtual pre-bid conference will be held 2026-01-28 at 09:00 AM CT (Zoom) with a site visit at 2:00 PM the same day; bidders are directed to obtain project manuals and drawings via www.uillinoisplanroom.com. Sealed bids are due February 12, 2026 at 2:00 PM local time; the solicitation includes participation goals (30% BEP and 3% veteran-owned) and is not a grant.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
The University of Illinois at Urbana-Champaign is soliciting sealed bids for Phase 4 of the Oak Street Steam Tunnel Rehabilitation to perform structural, mechanical, electrical, civil, and traffic-control repairs between station mark 000 and 700. A non-mandatory virtual pre-bid conference will be held 2026-01-28 at 09:00 AM CT (Zoom) with a site visit at 2:00 PM the same day; bidders are directed to obtain project manuals and drawings via www.uillinoisplanroom.com. Sealed bids are due February 12, 2026 at 2:00 PM local time; the solicitation includes participation goals (30% BEP and 3% veteran-owned) and is not a grant.
AvailableSeeking professional engineering services for the rehabilitation of an existing wastewater lift station.
Posted Date
Dec 11, 2025
Due Date
Jan 20, 2026
Release: Dec 11, 2025
Close: Jan 20, 2026
Seeking professional engineering services for the rehabilitation of an existing wastewater lift station.
AvailableReplacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
Posted Date
Sep 10, 2025
Due Date
Jan 29, 2026
Release: Sep 10, 2025
Close: Jan 29, 2026
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis