Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1 LS lift station rehabilitation; 1 LS SCADA instrumentation, metering equipment, installation and training; 1 EA project sign.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lake Cities Municipal Utility Authority is soliciting sealed bids for the rehabilitation of an existing lift station near Folly Beach Rd and N Hook St in Denton County, Texas. Bids are due at 2:00 PM CST on February 3, 2026, at 501 N Shady Shores Drive, Lake Dallas, TX 75065. The project involves upgrades and rehabilitation work at Lift Station #9; no grant funding is indicated.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Lake Cities Municipal Utility Authority is soliciting sealed bids for the rehabilitation of an existing lift station near Folly Beach Rd and N Hook St in Denton County, Texas. Bids are due at 2:00 PM CST on February 3, 2026, at 501 N Shady Shores Drive, Lake Dallas, TX 75065. The project involves upgrades and rehabilitation work at Lift Station #9; no grant funding is indicated.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
AvailableLift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Lift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
AvailableLift Station (Site)- furnish and install proposed improvements including, remove and replace existing asphalt pavement with concrete pavement, remove and replace existing chain link fence and gate, removal and replacement of two (2) pumps, removal and replacement of all piping and valves, protective coatings for wet well and valve pit surfaces, piping, valves, removal and replacement of existing force main, and installation of force main bypass. Lift Station - Furnish and install proposed improvements including but not limited to, removal and replacement of electrical service meter, fused disconnect, manual transfer switch and support rack, removal and replacement of lift station control panel with autodialer and phone service, installation of new lighting, pump and instrumentation termination boxes with support rack, instrumentation, above ground raceway, ductbanks, and power and control conductors.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Lift Station (Site)- furnish and install proposed improvements including, remove and replace existing asphalt pavement with concrete pavement, remove and replace existing chain link fence and gate, removal and replacement of two (2) pumps, removal and replacement of all piping and valves, protective coatings for wet well and valve pit surfaces, piping, valves, removal and replacement of existing force main, and installation of force main bypass. Lift Station - Furnish and install proposed improvements including but not limited to, removal and replacement of electrical service meter, fused disconnect, manual transfer switch and support rack, removal and replacement of lift station control panel with autodialer and phone service, installation of new lighting, pump and instrumentation termination boxes with support rack, instrumentation, above ground raceway, ductbanks, and power and control conductors.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →