Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction includes: installation of an 8" main line master meter and electric control valve assembly at the route 89/maple grove church road intersection; installation of a 6" main line master meter and electric control valve assembly on oak grove church road; replacement of approx 74 existing water service meters.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for emergency on-call services including labor, materials, and equipment for water distribution, sanitary sewer, and stormwater collection system repairs on an on-call and scheduled basis.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
This RFP is for emergency on-call services including labor, materials, and equipment for water distribution, sanitary sewer, and stormwater collection system repairs on an on-call and scheduled basis.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of four existing wastewater pump stations, electrical modifications to two wastewater pump stations and one water booster station, and installation of approximately 1,200 LF of new gravity sewer line with associated manholes.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Rehabilitation of four existing wastewater pump stations, electrical modifications to two wastewater pump stations and one water booster station, and installation of approximately 1,200 LF of new gravity sewer line with associated manholes.
AvailableProject includes the repair of water and sewer main lines and service lines throughout the charlotte water service area.
Posted Date
Dec 11, 2025
Due Date
Jan 21, 2026
Release: Dec 11, 2025
Close: Jan 21, 2026
Project includes the repair of water and sewer main lines and service lines throughout the charlotte water service area.
AvailableSupply and delivery of water & sewer materials.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Supply and delivery of water & sewer materials.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →