Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of cement concrete sidewalk, pedestrian curb ramps, and driveways, installation of new granite curb, reconstruction of hot mix asphalt driveways, full depth roadway patching, installation of drainage pipe and structures, minor drainage structure modifications, installation of signs, pavement markings, and other miscellaneous items of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Intersection improvements for the South 9th Street and Washington Street intersection, including expansion to 5-lanes, new sidewalks, ADA-compliant curb ramps, traffic signals, pavement striping, signing, milling, and full depth asphalt construction.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Intersection improvements for the South 9th Street and Washington Street intersection, including expansion to 5-lanes, new sidewalks, ADA-compliant curb ramps, traffic signals, pavement striping, signing, milling, and full depth asphalt construction.
AvailableIntersection improvements to expand the street to 5-lanes in each direction including two through lanes in each direction and a left-turn lane on each leg of the intersection. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection and new traffic signals will be installed. In addition, new pavement striping and signing will be installed. The project also includes milling and overlaying of existing asphalt with new full depth asphalt construction for widening of the intersection.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Intersection improvements to expand the street to 5-lanes in each direction including two through lanes in each direction and a left-turn lane on each leg of the intersection. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection and new traffic signals will be installed. In addition, new pavement striping and signing will be installed. The project also includes milling and overlaying of existing asphalt with new full depth asphalt construction for widening of the intersection.
CR 214 (King Street) and N Volusia Street Intersection Improvements
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
CR 214 (King Street) and N Volusia Street Intersection Improvements
AvailableThe major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Feb 5, 2026
Release: Oct 29, 2025
Close: Feb 5, 2026
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis