Summary
Work includes 864 CY unclassified excavation (cab, ac removal); 121 CY construct4" crushed aggregate base; 451 CY construct10" crushed aggregate base; 540 ton construct 6" thick ac; 58,800 SF cold mill existing ac pavement 2" uniform depth; 711 ton construct 2" thick asphalt rubber hot mix(arhm) overlay; 1,260 LF construct rolled curb, type r-2 per detail on sheet 2; 30 LF construct curb transition per detail on sheet 2; 247 LF construct curb and gutter per sppcw std plan 120-3, type a2-6; 237 ton construct 4" ac multi-use path; 4 EA construct curb ramp per sppwc std plan 111-5, case and type per plan/ see outside link.