CityTX
Posted
Nov 1, 2026
Dec 16, 2026
Description: Work includes installation and integration of digital airport systems to include the following: A. Flight information display systems (FIDS) B. Baggage information display systems (BIDS) C. Self-service baggage drop kiosks D. Common use passenger systems (CUPPS/CUSS). See attached file.
City · TX, US
Decision makers connected to this RFP from City of Corpus Christi.
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
CityTX
Posted
Nov 1, 2026
Dec 16, 2026
Provide professional engineering services of corpus christi international airport.
Federal Transit Administration
FederalDC
Posted
Oct 26, 2026
Nov 30, 2026
Turnkey fare-payment technology solution for approximately 26 revenue buses, including equipment, software, integration, installation, testing, training, warranty, maintenance, and support.
StateNV
Posted
Nov 23, 2026
Dec 9, 2026
The State of Nevada, Office of the Military, is seeking bids/proposals from qualified contractors to provide and furnish and install Americans with Disabilities Act (ADA) compliant automatic doors at the main front entrance of the Combined Support Maintenance Shop (CSMS) located in Carson City, Nevada The State of Nevada, Office of the Military, is seeking bids/proposals from qualified contractors to provide and furnish and install Americans with Disabilities Act (ADA) compliant automatic doors at the main front entrance of the Combined Support Maintenance Shop (CSMS) located in Carson City, Nevada Scope: The project scope includes, but is not limited to, the following components: * Removal & Disposal: Safely remove and dispose of existing manual storefront door hardware/doors as specified in the technical drawings. * ADA Installation: Install new commercial-grade aluminum storefront doors equipped with fully automatic, low-energy operators compliant with ADA and ANSI A156.19 standards. * Electrical & Controls: Run necessary electrical wiring from the nearest electrical panel to power the operators. Install interior and exterior wireless or hardwired ADA push-plate actuators and existing card readers. * Integration: Ensure the new door operators integrate seamlessly with the facility's existing access control and security systems. * Finishes & Seals: Provide appropriate weather-stripping, thresholds, and trim work to ensure a secure, weather-tight finish. * Testing & Certification: Perform complete system testing, calibration, and provide operational training to facility staff upon completion.
CityNY
Posted
Nov 19, 2026
Dec 10, 2026
Installation of an HVAC system at Southold Town Hall.