Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeks qualified professionals to furnish all labor, materials, and equipment and perform all work for installation of three (3) new intermediate distribution frame (IDF) rooms. The work will include providing and installing complete technology systems, cabling, and components as well as additions and modifications to existing mechanical, electrical and fire protection systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
North Charleston Sewer District is soliciting bids for Collection System Improvements that include cured‑in‑place pipe (CIPP) installation along the Ashley Interceptor and rehabilitation of existing manholes. The work includes approximately 5,329 linear feet of CIPP (about 577 LF of 42‑inch and 4,752 LF of 36‑inch gravity sewers) and rehabilitation of 25 manholes. A pre‑bid meeting is scheduled for January 29, 2026, and bids are due February 17, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
North Charleston Sewer District is soliciting bids for Collection System Improvements that include cured‑in‑place pipe (CIPP) installation along the Ashley Interceptor and rehabilitation of existing manholes. The work includes approximately 5,329 linear feet of CIPP (about 577 LF of 42‑inch and 4,752 LF of 36‑inch gravity sewers) and rehabilitation of 25 manholes. A pre‑bid meeting is scheduled for January 29, 2026, and bids are due February 17, 2026 at 2:00 PM local time.
AvailableCHS yearbook.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
CHS yearbook.
AvailableAdditions and renovations to elementary school. Construct two new additions as follows: addition area a shall be two stories and consist of three pk classrooms with toilets, three general academic classrooms, two small group instruction rooms and related spaces. Addition area b shall consist of a new multi-purpose room with stage, library expansion and related spaces. Renovations shall consist of the following: 1. Area a- two new small group instruction rooms,2. Area b- re-configuration of existing gym to create new music room and library; 3. Area c- cafeteria increased floor space by removing stage, kitchen and serving line renovations and 4. Area d- renovate room
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Additions and renovations to elementary school. Construct two new additions as follows: addition area a shall be two stories and consist of three pk classrooms with toilets, three general academic classrooms, two small group instruction rooms and related spaces. Addition area b shall consist of a new multi-purpose room with stage, library expansion and related spaces. Renovations shall consist of the following: 1. Area a- two new small group instruction rooms,2. Area b- re-configuration of existing gym to create new music room and library; 3. Area c- cafeteria increased floor space by removing stage, kitchen and serving line renovations and 4. Area d- renovate room
Seal assemby, shaft, spring loaded; NSN: 4320-01-269.
Posted Date
Jan 13, 2026
Due Date
Feb 15, 2026
Release: Jan 13, 2026
Close: Feb 15, 2026
Seal assemby, shaft, spring loaded; NSN: 4320-01-269.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →