Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of concrete caps on three existing low-water crossings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of concrete north of the football field. Concrete shall be 47B or greater at 7" thick x 80' wide by 180' Long with additional concrete 7" Thick x 35' x 25' joining the North Parking lot to 28th Street . Concrete must be poured to natural slope and drainage needs. All sub-surface/base must be prepped and prepared for such pour to meet compaction and support. No removal of existing concrete with this project, but removal of existing soils may be necessary.
Posted Date
Jan 8, 2026
Due Date
Feb 6, 2026
Release: Jan 8, 2026
Close: Feb 6, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of concrete north of the football field. Concrete shall be 47B or greater at 7" thick x 80' wide by 180' Long with additional concrete 7" Thick x 35' x 25' joining the North Parking lot to 28th Street . Concrete must be poured to natural slope and drainage needs. All sub-surface/base must be prepped and prepared for such pour to meet compaction and support. No removal of existing concrete with this project, but removal of existing soils may be necessary.
Three (3) month non-encumbered contract to provide materials and installation of asphaltic concrete base and surface coarse(hot mix/hot laid asphalt).
Posted Date
Jan 29, 2026
Due Date
Feb 12, 2026
Release: Jan 29, 2026
Close: Feb 12, 2026
Three (3) month non-encumbered contract to provide materials and installation of asphaltic concrete base and surface coarse(hot mix/hot laid asphalt).
AvailableThe City of Charlottesville is requesting bids for the Downtown Mall Crossings project involving the removal and replacement of brick and granite pavers at 2nd St NW and 4th St NE. The scope includes the installation of a custom drop inlet, concrete pipe, concrete curb, and sidewalk, as well as the replacement of a drop inlet top. The contractor is responsible for providing all supervision, equipment, labor, and materials necessary for completion by June 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Close: Feb 6, 2026
The City of Charlottesville is requesting bids for the Downtown Mall Crossings project involving the removal and replacement of brick and granite pavers at 2nd St NW and 4th St NE. The scope includes the installation of a custom drop inlet, concrete pipe, concrete curb, and sidewalk, as well as the replacement of a drop inlet top. The contractor is responsible for providing all supervision, equipment, labor, and materials necessary for completion by June 2026.
AvailableWork generally consists of furnishing all labor, materials, equipment, and services necessary for the installation of a concrete slab for a fitness court.
Posted Date
Jan 14, 2026
Due Date
Feb 6, 2026
Release: Jan 14, 2026
Close: Feb 6, 2026
Work generally consists of furnishing all labor, materials, equipment, and services necessary for the installation of a concrete slab for a fitness court.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →