Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the installation of approximately 6,500 linear feet of multi-duct underground conduit, including twelve in-ground pull boxes and tracer wire test stations, primarily through horizontal directional drilling for a new fiber optic route.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contractor to supply all materials, labor, and equipment to install approximately ±6,500 LF of conduit for a new fiber optic route by means of horizontal directional drilling. Twelve in-ground pull boxes with tracer wire test stations are to be incorporated at various locations to break up the project into manageable lengths or replace existing smaller vaults. All of the in-ground pull boxes will be interconnected by two (±6,500 bore x 2 = ±13,000' of duct) 1 1/4" conduits, with some locations connected by three conduits.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Close: Jan 28, 2026
Contractor to supply all materials, labor, and equipment to install approximately ±6,500 LF of conduit for a new fiber optic route by means of horizontal directional drilling. Twelve in-ground pull boxes with tracer wire test stations are to be incorporated at various locations to break up the project into manageable lengths or replace existing smaller vaults. All of the in-ground pull boxes will be interconnected by two (±6,500 bore x 2 = ±13,000' of duct) 1 1/4" conduits, with some locations connected by three conduits.
Available2026 glass crusher at north sea transfer station.
Posted Date
Jan 22, 2026
Due Date
Feb 25, 2026
Release: Jan 22, 2026
Close: Feb 25, 2026
2026 glass crusher at north sea transfer station.
AvailableProcurement of engineering design services for the replacement of the North Albany Water Pump Station.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Procurement of engineering design services for the replacement of the North Albany Water Pump Station.
AvailableThe solicitation titled "7982 North Hollywood Central Chlorination Station Replacement" is an Invitation for Bid issued by Los Angeles Water & Power. It was posted on Dec. 15, 2025 with a response deadline of Jan. 29, 2026. Bids must be submitted electronically through the eRSP system; the supporting documents require login and no public PDF is available.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
The solicitation titled "7982 North Hollywood Central Chlorination Station Replacement" is an Invitation for Bid issued by Los Angeles Water & Power. It was posted on Dec. 15, 2025 with a response deadline of Jan. 29, 2026. Bids must be submitted electronically through the eRSP system; the supporting documents require login and no public PDF is available.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis